Town Hall Renovations

The Town Hall Renovation project was approved at the 6/16/20 Annual Town Meeting. Construction began Fall, 2020.
Town Hall Renovation Progress as of 12/15/21
Town Hall progress 12.15.21
Town Hall progress 12.15.21 2
Town Hall Renovation Progress as of 7/20/21
Town Hall progress 7.20.21

The Town has reinvigorated its space planning efforts with a new team in place from the firm, Icon Architecture of Boston, MA, who specialize in the adaptive re-use of older buildings to meet modern needs with an eye toward conservation and energy efficiency. The result is a smartly laid out plan in our existing structure that greatly improves access to all of our Town Departments services with the highest standards of accessibility, energy efficiency and value. It’s a new way to solve an old problem and preserve our local resources at the same time.

Presentation from June 16, 2020 Annual Town Meeting

New design options
2020_03_04 OB Town Hall Public Input Presentation 39
Scheme 1 back
Scheme 2 back
2020-03-10 OB Town Hall Structural Model
2020_03_04 OB Town Hall Public Input Presentation 18
2020_03_04 OB Town Hall Public Input Presentation 19
2020_03_04 OB Town Hall Public Input Presentation 20
c-md-ob-town-hall2-p
2020_03_04 OB Town Hall Public Input Presentation 44
March 4, 2020 Town Hall Public Input Presentation by ICON Architecture (see below slideshow)